Renewal & diversion of water, wastewater and stormwater assets in the Wallace St Corridor.
Read More
This project included challenging commercial CBD connection work inside a busy construction site and outside the site in the pedestrianised section of Cuba St in Wellington’s CBD.
This project included some challenges associated with working on a busy construction site in a greenfield environment.
On the night of Wednesday 23rd January a rain event caused an existing brick culvert to blow out under a property in Moir St.
Peka Peka to Otaki (PP2O) is an extension of the RONS project north on SH1. It is a complex infraxstructure project being undertaken by Fletcher Construction Infrastructure on behalf of NZTA.
GPFL were engaged by BPC as a subcontractor to deliver all the underground pipework associated with the new pumping station.
This project saw us working with multiple teams for two consultants across Wellington City.
This project included residential 3 waters connections in a typical narrow and steep Wellington suburban location. There was time pressure on the work to meet the developers handover dates.
Ward St is a residential suburban street in Upper Hutt. Along with the risks assocaited with residents and drivers the road also has a rail crossing for the Wairarapa line.
Construction of approximately 600m of new Stormwater drainage, 330m of new Wastewater Drainage and 400m of new Potable Water for a new Development. Including connections and disconnections from the public network.
The Terrace is an iconic street in the heart of the capital’s business precinct, with government departments, head offices and large corporations side by side with each other down each side of this 19th century street.
This project included some significant challenges associated with working in an operational prison environment. We worked with the main contractor and prison officers to ensure that our people were not put at unnecessary risk and that delivery was not jeopardised.
Projects Archive