Where capacity is not an issue but the existing asset is in poor condition we slipline an existing pipe with a new PE pipe. Sliplinging minimises the amount of excavation that needs to be undertaken and the risks that come with it; principally: excavation stability, working around underground services and traffic management.
By using our constant tension winch we can guarantee that the newly installed pipe has not been overstressed and eliminate the risk of catastrophic failure of the system during the activity.